Renewable Energy

In QL’s strategic decision to reduce consumption of fossil fuel-based energy, we progressively increased solar panel installations in our operation sites and actively supply renewable energy generated from the biogas plant to the grid. 

In FY2022, 7.5% of total energy consumption was supplied from our renewable energy initiatives, which is 2.0% higher than FY2021. QL generated 53,061 GJ of renewable energy, avoiding 26,240 tCO2e in GHG emissions.

QL Plantation operates a biogas plant which uses methane captured to generate power for on-site operations with excess power sold to the local grid. In FY2022, the biogas plant generated a total of 10,688.4 GJ of electricity, avoiding a total of 20,240 tCO2e GHG emissions. Approximately 55% of the generated energy was used on-site. The biogas plant performance was affected by lower processing activities in palm oil mill.

Rainwater Harvesting

Rainwater Harvesting QL continuously evaluates our water withdrawal sources to mitigate water scarcity risk. Rainwater harvesting is one our new

Read More »

Renewable Energy

Renewable Energy In QL’s strategic decision to reduce consumption of fossil fuel-based energy, we progressively increased solar panel installations in

Read More »